8D Space made composite beam construction animation for CCCC Second Harbor Eng

2025-09-23  来自: 武汉四维水晶石动画科技有限公司 浏览次数:251

8D Space made composite beam construction animation for CCCC Second Harbor Eng


Recently, 8D Space successfully produced the composite beam construction process animation for the 5th Engineering Branch of CCCC Second Harbor Engineering Co., Ltd.

As a key infrastructure project of the "Belt and Road Initiative" in North Africa, the Algerian Railway Project adopts European standards for its entire design. Composite beam construction involves difficulties such as steel-concrete composite structures and multi-process coordination. Using 3D modeling and simulation technology, the project team transformed traditional 2D drawings into visual "construction guidelines", intuitively demonstrating core links like steel bar positioning, concrete pouring sequence, and prestress tensioning, effectively reducing the risk of on-site operation errors.

Through 3D dynamic simulation, the animation accurately presents the full-process construction technology of composite beams, from component prefabrication, transportation, hoisting to assembly and post-pouring forming. It provides efficient and intuitive visual support for CCCC Second Harbor Engineering Co., Ltd. in technical disclosure, scheme demonstration and project reporting for large-scale infrastructure projects.


可视化


Contact number:+8615902788822

Email number:512375387@qq.com

Company Website:www.crystal4d.com

Address: 18/F, Block B, Asian Trade Plaza, No. 628, Wuluo Road, Wuchang District, Wuhan

可视化

业务范围

相关资讯 更多>>

武汉四维水晶石动画科技有限公司,专营 工程动画 数字孪生 效果图 数字沙盘 软件开发 宣传片 AR/VR BIM 等业务,有意向的客户请咨询我们,联系电话:15902788822

CopyRight © 版权所有: 武汉四维水晶石动画科技有限公司 技术支持:武汉华企在线 网站地图 XML

本站关键字: 工程动画 桥梁动画 道路动画 铁路动画 隧道动画 BIM 数字孪生 效果图


扫一扫访问移动端