8D Space made composite beam construction animation for CCCC Second Harbor Eng

2025-09-23  来自: 武汉四维水晶石动画科技有限公司 浏览次数:36

8D Space made composite beam construction animation for CCCC Second Harbor Eng


Recently, 8D Space successfully produced the composite beam construction process animation for the 5th Engineering Branch of CCCC Second Harbor Engineering Co., Ltd.

As a key infrastructure project of the "Belt and Road Initiative" in North Africa, the Algerian Railway Project adopts European standards for its entire design. Composite beam construction involves difficulties such as steel-concrete composite structures and multi-process coordination. Using 3D modeling and simulation technology, the project team transformed traditional 2D drawings into visual "construction guidelines", intuitively demonstrating core links like steel bar positioning, concrete pouring sequence, and prestress tensioning, effectively reducing the risk of on-site operation errors.

Through 3D dynamic simulation, the animation accurately presents the full-process construction technology of composite beams, from component prefabrication, transportation, hoisting to assembly and post-pouring forming. It provides efficient and intuitive visual support for CCCC Second Harbor Engineering Co., Ltd. in technical disclosure, scheme demonstration and project reporting for large-scale infrastructure projects.


可视化


Contact number:+8615902788822

Email number:512375387@qq.com

Company Website:www.crystal4d.com

Address: 18/F, Block B, Asian Trade Plaza, No. 628, Wuluo Road, Wuchang District, Wuhan

可视化

业务范围

相关资讯 更多>>

武汉四维水晶石动画科技有限公司作品主要分为八大类(桥梁工程、道路工程、隧道工程、水工工程、维修加固工程、机械、工艺流程、建筑地产)动画,智慧工地,BIM研发与应用等,是中交、中建、中国中铁、中国铁建、中船重工等多家世界500强集团的工程动画业务的合作单位。联系电话:15902788822

CopyRight © 版权所有: 武汉四维水晶石动画科技有限公司 技术支持:武汉华企在线 网站地图 XML

本站关键字: 工程动画 桥梁动画 隧道动画 施工动画 工艺动画 改扩建动画


扫一扫访问移动端