Recently, our company completed the construction animation of the deck-type concrete-filled steel tube arch bridge over the Yarlung Tsangpo River for China Railway Construction Bridge Engineering Bureau Group Co., Ltd.
Located in a plateau canyon area, the project features frigid weather, strong winds and complex geological conditions. Construction procedures such as arch rib assembly and concrete pouring into steel tubes involve high difficulties and stringent technical control requirements.
Powered by 3D visualization technology, this animation fully reproduces key construction processes including arch rib erection, segment assembly and concrete pouring inside steel tubes. It clearly demonstrates the structural characteristics of the bridge and the critical construction technologies for plateau projects. The animation can be applied to technical disclosure, construction method reports, achievement promotion and industrial technical exchanges.


Contact number:+8615902788822
Email number:512375387@qq.com
Company Website:www.crystal4d.com
Address: 18/F, Block B, Asian Trade Plaza, No. 628, Wuluo Road, Wuchang District,Wuhan